Engineering measurement and sampling
(1).Inspect the base project, clean
sundries in base and smooth in time.
Operation site should be clean to ensure
environment and operational quality.
(2).Measure surrounding equipments by tape
if compliance with standard size of sports
yard. Measure and sampling according to the
design drawing if it is not standard size.
(3).Surface installation
Ⅰ.Place non-woven cloth along the length
of field and orientation should be vertical
to the turf direction. Firmly adhere the
clothes.
Ⅱ.Cut the field lines according to the
length specification of drawings. Firmly
adhere the line straightly.
Ⅲ.Place the turf in natural specification
onto the non-woven cloth and joint the
turfs.
Ⅳ.Cut the joint turf neatly and the joint
seam should be within 10mm.
Ⅴ.Place joint cloth under cutting district
and brush special glue for turf on joint
side. Joint and strike for firm connection
after merely dry.
Turf joint process
Preparation for joint:
Ⅰ.Clean the bottom of turf, non-woven
cloth and seam cloth for jointing and keep
the surface dry.
Ⅱ.The operational temperature should be
between 0-40℃. Rainy or humid days are not
suitable for operation or else the joint
will be failed.
Detailed operation procedure:
(1).Smear glue:
Use the brush to smear evenly on the
bottom of turf. The repeat of glue will
cause bubble or falling. Control the
thickness of glue and smearing speed should
be proper. Smear respectively on two
jointing sides.
(2).Stickiness:
Control proper dry time according to the
temperature and humidity etc, generally
10-15 minutes after smearing would be
better. Aim at joint for only one time and
firmly stick it. Prohibit moving the joint
repeatedly.
(3).Press:
Clear up the surface after stickiness and
strike the joint to two sides by special
rubber hammer to make the joint firmer.
(4).Solidifying:
Solidifying period generally lasts for 3
days and the intensity will be inspected
after 10 days. Therefore it should carefully
maintain the solidifying to avoid
over-expose, water or movement so as to
attain the optimum joint.
(5).Clean up the fragment of field after
joint and before filling quartz and rubber
grain.
石英沙铺装工艺
(1).arenaceous quartz process:
Adopt specific arenaceous quartz to fix
grass. Fill quartz to keep the grass above
ground within 10mm. Evenly place rubber
grains on the surface of grass. Prohibit
sharp grain to prevent athletes from injury.
(2).Fill the quartz straightly by manual.
(3).Place arenaceous quartz and rubber
grain after placement of artificial turf
field materials.
(4).Place arenaceous quartz by integral
method.
(5).Check if placement of arenaceous
quartz is smooth and enough.
Ⅰ.Remove all sundries during placement to
ensure smoothness.
Ⅱ.Brush repeatedly by hard brush to make
arenaceous quartz tight after placement of
arenaceous quartz.
Ⅲ.The same process for placement of rubber
grains. |